Online Message

CONTACT US

message-img
  • (PDF) ZADRA Elution Circuit Optimisation and Operational

    The ZADRA elution circuit at Gold Fields Ghana Limited was designed as a pressure system with an operational pressure set point of 350 kPa. It consists of circulating 3% sodium hydroxide water

    Details >
  • Carbon Stripping Denver Mineral Engineers

    Atmospheric pressure Zadra stripping was the first commercially successful process developed for stripping gold from carbon. The process was developed by J. B. Zadra, and others, at the U.S. Bureau of Mines (USBM) in the early 1950’s. The results of their research were first applied at Golden Cycle Gold Corporation’s Carlton Mill at Victor, Colorado in 1951. The results of Zadra’s work

    Details >
  • Zadra elution circuit Pyrometallurgy: Roasting, Smelting

    To participate in the 911Metallurgist Forums, be sure to JOIN & LOGIN Use Add New Topic to ask a New Question/Discussion about Pyrometallurgy and Electrometallurgy. OR Select a Topic that Interests you. Use Add Reply = to Reply/Participate in a Topic/Discussion (most frequent). Using Add Reply allows you to Attach Images or PDF files and provide a more complete input. Use Add Comment = to

    Details >
  • Comparison of AARL and High Pressure Zadra Stripping:

    Comparison of AARL and High Pressure Zadra Stripping: Why one Carbon Elution Process Works Best (English) Johnson, G. / Third, B. / Randol International

    Details >
  • OPTIMIZING THE OPERATING CONDITIONS OF GOLD ELUTION

    1.4 Zadra process description Tau Lekoa stream uses the Zadra process. The eluant is continuously circulated through the column and an electrowinning cell in series. A caustic cyanide solution, normally 0.2 to 0.5 % NaCN and 2% NaOH, is pumped to the elution column and is pre-heated by the solution leaving the column.

    Details >
  • AN EXPERIMENTAL STUDY OF THE EFFECT OF PHIRI IP

    that affect gold elution in a modified Zadra gold elution process. Elution of gold is a process where gold is desorbed or eluted back into solution by the effect of chemical and mechanical factors. This study focused on the mechanical factors namely, temperature, pressure and flow rate. An experimental test rig that mimics the Zadra gold

    Details >
  • Elution behaviour of metals from carbon

    A laboratory-scale elution rig was commissioned to simulate Zadra and AARL carbon elution conditions, see Figure 1. The majority of the system was constructed from stainless steel tubing and Swagelok fittings. The elution column was ~600 mm long with an internal diameter of 25 mm, and a capacity of ~100 g of granulated activated carbon per experiment. The void volume of the system, when loaded

    Details >
  • GOLD FIELDS Mineral Resource and Mineral Reserve

    The elution circuit is also a pressure Zadra circuit and is designed to elute 10 tons of loaded carbon per day utilising fuel-fired burners for heating energy. Regeneration of carbon takes place in one of two rotary kilns. A gravity circuit has recently been installed (October 2006). A stand alone 30 inch Knelson Concentrator is fed by each of the running mills and recovers gold concentrate

    Details >
  • Elution and Carbon Reactivation Resource book

    The elution column is a 10m high by 1.2m diameter mild steel rubber lined pressure vessel (rated to 350kPa). Having a high ‘length to diameter’ ratio enables solution to flow evenly through the bed of carbon without short-circuiting or ‘tunnelling’.

    Details >
  • AARL Carbon Stripping System Operation: Elution

    Metallurgical ContentAcid WashingPreheat StageElution stageSequence ControllersDescription of the Carbon Stripping Process (See fig. 1)Acid Wash of CarbonTransfer to Elution ColumnReagent Addition and PreheatElution and Carbon CoolTransfer of Barren Carbon to the Regeneration Kiln HopperElectrowinningOperation of the Carbon Stripping SystemFault Finding Procedure for the

    Details >
  • zadra carbon strip process Chalk & Cork

    May 01, 1994· There are two main types of elution processes and these are the Zadra and the AARL elution variant. The Zadra elution process makes use of pumping a hot (90) caustic cyanide solution with the loaded carbon in the elution column at atmospheric pressure. The eluate obtained is then treated in an electrowinning circuit where gold is removed.

    Details >
  • Zadra Vs Aarl Elution Process bastoni.au

    Zadra Vs Aarl Elution Process Pre Elution Wash Metallurgist & Mineral Processing Engineer. 4 Apr 2017 . You should be able to modify this procedure for pressure Zadra or AARL but will require two stages of elution, the first at the low temperatures. Chat Online The role of cyanide in the multi-component elution . Van der Merwe (1991) proposed a generalised model for the simulation of both

    Details >
  • Elution Heating System Protherm Systems

    Elution systems and equipment suitable for both ZADRA and AARL elution processes. Heating Options. Selection dependent upon availability and cost of energy at site. Fired systems utilising diesel oil, heavy fuel oil, and gas; Electrical heaters ; Steam; Heating Media (Primary Heat Exchangers) Systems utilising thermal oil; Systems utilising pressure hot water; Systems utilising steam; Primary

    Details >
  • Investigation of Mercury Reduction in Gold Stripping

    1.6 Carbon elution/ stripping 18 1.6.1 Atmospheric Zadra stripping 20 1.6.2 Pressurized Zadra stripping 23 1.6.3 Anglo American Research Laboratory (AARL) stripping 25 1.6.4 Alcohol stripping 29 1.6.5 Micron stripping 35 1.7 Acid washing carbon 37 1.8 Acid washing followed by pressure Zadra

    Details >
  • Zadra Pressure Stripping Products & Suppliers

    im- proved mass transfer (lMT) cell which overcame drawbacks of the well-known Zadra cell by providing and reduces cost- effectiveness of the operation because it decreases gold loading, increases stripping time, complicates fire techniques including protec- tion of refractory materials by CVD, gold plating of high pressure turbo pumps for

    Details >
  • Gold Elution Systems Protherm Systems

    Elution systems and equipment suitable for both ZADRA and AARL elution processes. Heating Options. Selection dependent upon availability and cost of energy at site. Fired systems utilising diesel oil, heavy fuel oil, and gas; Electrical heaters ; Steam; Heating Media (Primary Heat Exchangers) Systems utilising thermal oil; Systems utilising pressure hot water; Systems utilising steam; Primary

    Details >
  • peter&x Minerals Sweden 6t Modular Gold Elution Plant

    > peter&x Minerals Sweden 6t Modular Gold Elution Plant. 2010 Laiva, Finland. Client: peter&x Minerals Sweden, for Nordic Mines Go back to projects Printable Version. Como Engineers were engaged to supply a 6 tonne PLC automated Pressure Zadra System with 300kg/hr LPG fired carbon regeneration kiln and integral goldroom. The plant is the most modern of Como’s designs to date and was designed

    Details >
  • US6200364B1 Process for eluting precious metals from

    The process also improves elution efficiency when barren electrowinning solution is recycled in the elution process. A process is disclosed for the recovery of gold and/or silver values from activated carbon, wherein they are adsorbed as cyanide complexes. The process uses an eluant containing sugar. The process allows the eluant to pass through fresh carbon twice, thereby reducing the volume

    Details >
  • GOLD FIELDS Mineral Resource and Mineral Reserve

    The elution circuit is also a pressure Zadra circuit and is designed to elute 10 tons of loaded carbon per day utilising fuel-fired burners for heating energy. Regeneration of carbon takes place in one of two rotary kilns. A gravity circuit has recently been installed (October 2006). A stand alone 30 inch Knelson Concentrator is fed by each of the running mills and recovers gold concentrate

    Details >
  • ACTIVATED CARBON IN GOLD RECOVERY Kemix

    under pressure to prepare a dense carbon rich raw material. The briquettes would normally be crushed and screened prior to carbonization. Carbonization Carbonization is the step that produces char. In this step, the raw materials are indirectly heated up to 700 °C to drive off the volatile organic contaminants and dehydrate the raw material

    Details >

News & Cases

We provide quality and efficient solutions to our global customers